Workshop in Ixelles · Appointments Mon–Fri
Request a proposal

Joinery measured to the room, not the catalogue

Veril Demer builds wardrobes, library walls and kitchen fronts in solid oak and lacquered MDF for Brussels row houses where millimetres matter at sloping ceilings.

Request a proposal

Current lead time

Survey slots: 2 weeks ahead. Production: 8–12 weeks after approved drawings. Installation bundled in Brussels postcodes 1000–1200.

Measured fit

Laser survey captures out-of-square walls; panels scribed on site before final CNC cut.

Visible grain

Oak book-matched on doors wider than 600 mm; oil finish maintained with supplied care kit.

Quiet close

Blum or equal soft-close throughout; hinge zones marked on plans for electrician coordination.